With Double Steam Power Over the Mountain Route. 
Scheduled on a cold, cloudy and rainy November day in 1930, at 2:32 p.m., 95002 helps express train 176 over the 1:44 ramp of the Geislinger Steige.​​​​​​​

On such days the rails are particularly slippery and require the driver's greatest attention to prevent the drive wheels from spinning.
In Adobe Fresco I started with a light preliminary drawing and worked my way from background to detail with many Kyle T. Webster brushes.
Thank You for Watching!

You may also like

Back to Top